Texas State University Bobcat Stadium Master Plan

Phase One improvements are planned to add 9,600 new spectator seats in two corners of the stadium, a new three-level press box with six entertainment suites, and an enclosed stadium club with 120 seats. A new 10,000 SF Strength and Conditioning Center will also be constructed beneath one of the new grandstands to provide space in the end zone Athletic Center for a new configuration of locker rooms. The budget for Phase One improvements is $16 Million.
Phases Two through Five include relocation of the track to an adjacent site and will add a new two level end zone grandstand and a third level sideline grandstand to ultimately increase the stadium capacity to 40,000.
Other improvements include repairs of the cast-in-place concrete grandstand, construction of new wheelchair seating positions with enhanced sightlines, new concessions and toilet facilities.
Services
Feasibility StudyProgramming
Master Planning
Design Consulting
Equipment Specifications
Operational Planning
Program Features
Phased Seating ExpansionThree-Level Press Box
Entertainment Suites & Club
10,000 sf Strength & Conditioning
Project Architect: | Joel Leider |
Architect of Record: | Broaddus & Associates |
Project Cost: | $16 million |
Owner Reference: | Dr. Larry Teis Director of Athletics |
Completion Date: | TBD |