University of Central Missouri Varsity Softball Stadium and Sports Complex

Former Director UCM Physical Facilities
As we concluded our Athletics Facility Master Plan for the campus, University of Central Missouri engaged us to design the South Farm Athletic Complex to include the first series of implementation projects. A varsity softball stadium, a slow-pitch intramural and tournament complex and three soccer fields were completed in Phase One. A clubhouse building beyond the left-field fence added team support facilities in the second phase of project development.
In 2003, Facilities Planning Director, Mark Gardner and Coach Sumrell called SportsPLAN Studio again to design a press box overlooking each of the four ballfields with ground level concessions stand, officials’ locker rooms and a field maintenance garage.
Services
Feasibility StudyProgramming
Master Planning
Design Consulting
Equipment Specifications
Operational Planning
Program Features
Varsity Stadium FieldThree Tournament Slow-pitch Fields
Soccer Fields
Sand-capped Athletic Playing Field
300 Permanent Spectator Seats
Concrete Dugouts
Phased Two Team Clubhouse
Phase Three Press Box and Ops Center
Project Manager: | Pam Scott |
Project Cost: | $1.7 million |
Owner Reference: | Rhesa Sumrell |
Completion Date: | 1999 - Phase 1 2005 - Phase 3 |